Act Amending the Planning Act, the Building Code and the Building Code and Planning Act Implementation Act ↗

Introduced:
15 June 2026
Author:
Government · coalition at introduction: Reform, Eesti 200
Stage
Second reading

The draft replaces the approval procedure of the Land and Spatial Board (Maa- ja Ruumiamet, MaRu) for plans with a coordination procedure. It also clarifies detailed plan tasks and deadlines and requires initiation applications to go through the planning database. A procedural economy principle is added to the Building Code.

Changes and additions

  1. MaRu approval replaced by coordination

    According to the explanatory memorandum, MaRu approves comprehensive and detailed plans late in the procedure, and the approval has been a substantive check of lawfulness.
    The approval procedure is abolished and MaRu takes part as a cooperation partner and coordinating body. The council (volikogu) adopts the comprehensive plan after all coordinations are obtained.
  2. Consent to amend a county plan

    A comprehensive plan proposing to amend a county plan is sent, after all coordinations, to the responsible minister or an authorised body. Consent is given or refused within 30 days.
  3. Detailed plan tasks

    The current section 126 lists mandatory and need-based tasks together, and the memorandum says it is not always clear when to solve the latter. The current wording speaks of dividing into plots.
    Mandatory tasks (including determining plots) and tasks to be solved when needed are split into two paragraphs. Determining kuja (a protective buffer zone) is dropped and building depth becomes need-based.
  4. Application via the planning database

    The application to initiate a detailed plan and its documents are submitted electronically to or through the planning database (planeeringute andmekogu). If that is impossible, the organiser enters them into the database.
  5. Deadline for the initiation decision

    According to the memorandum, the decision is generally made within 30 days, extendable to 90 days for good reason.
    The general 30 days remains, but in three listed cases (e.g. a preliminary assessment for strategic environmental assessment) the deadline is 90 days. Decisions are entered in the database within 14 days.
  6. Interim deadline for coordination

    The detailed plan must be submitted for coordination and opinions within two years of the initiation application.
  7. National plan and development plans

    The national spatial plan is taken into account when preparing sectoral development plans and programmes.
  8. Procedural economy in the Building Code

    Procedures must be organised so that key facts are identified as early as possible and remarks are given together, unless new significant facts emerge.

How the text changed during the proceedings

  • Between the introduced and latest texts, the documents show only that a lead committee (the Economic Affairs Committee) was added. No amendment proposals appear in the documents.

Votes

No votes have been held yet.

Sources (Riigikogu documents) (9)

Official page of the bill on the Riigikogu website: proceedings and all documents.