Act Amending the Environmental Impact Assessment and Environmental Management System Act and the Heritage Conservation Act ↗

Introduced:
15 June 2026
Author:
Government (Ministry of Climate) · coalition at introduction: Reform, Eesti 200
Stage
Second reading

The draft amends the Environmental Impact Assessment and Environmental Management System Act (KeHJS) and the Heritage Conservation Act (Muinsuskaitseseadus). According to the initiators, the aim is to make environmental impact assessment (KMH) faster and lighter in administrative burden while keeping environmental protection at the same level. It narrows the concept of environmental impact, replaces several mandatory KMH cases with screening, allows skipping the KMH programme, abolishes follow-up assessment and adds a heritage impact study.

Changes and additions

  1. Definition of environmental impact

    Impact on human health, property and cultural heritage, and on well-being, counted as environmental impact without a requirement that it work through the environment.
    Environmental impact covers impact on health, cultural heritage or property only where it works through the environment. The reference to well-being is removed (also from 'significant environmental impact', § 31 and the 'social needs' wording in § 40).
  2. Mandatory KMH and screening

    KMH was mandatory for e.g. sea dredging, dumping at sea, landfill closure, forest clearing over 100 ha, dams and hydropower plants on 'sensitive recipients', and activities set by strategic planning documents. Screening was required for any change or extension of a listed activity.
    These activities (points 21, 24, 311 and 34) are no longer mandatory KMH and go to screening. Mandatory KMH is clarified for roads (over ten km) and a new railway line. For a change, screening is needed only if significant impact cannot be ruled out, or if the main purpose is developing or testing new technology or products under a permit valid for up to two years.
  3. Screening draft

    The developer must submit information on the activity as a screening draft (eelhinnangu kavand). The decision-maker may demand additions only for missing information of material importance. Forest notices are exempt.
  4. Skipping the KMH programme

    If the nature and scope of the significant impact are known from an earlier similar KMH or KSH (strategic environmental assessment), the scope is set in the initiation decision and no programme is made. This does not apply with significant transboundary impact. The initiators estimate savings of up to five months.
  5. Public discussions and programme content

    A public discussion of the KMH programme was mandatory, the decision-maker checked programme and report compliance before publication and gave a position afterwards, and a notice had to be posted in a public place. The programme had to present real alternatives and links to strategic planning documents.
    The programme discussion, the pre-publication check and the decision-maker's position are dropped. The report discussion stays but is held during the public display (at least ten days after its start, at least ten days before its end). A social media notice is added. Alternatives are no longer required, links to valid plans are required, and proposals and replies are given in a table.
  6. Expert licence requirements

    A lead expert needed a 60-hour management training, and a licence applicant's degree had to be in natural sciences or environmental protection.
    The management training requirement is dropped (also for KSH lead experts), forestry degrees are added, address requirements are dropped, and the register of lead experts is published in KOTKAS (an information system).
  7. Follow-up assessment abolished

    KeHJS § 25 regulated follow-up assessment of KMH.
    The follow-up assessment procedure is repealed. The initiators say it has not been applied and its aims are met through permit-based monitoring.
  8. Heritage impact study

    If screening ends without KMH or KSH but significant impact on heritage may arise, a study is carried out where needed. Before, a study under § 46 of the Heritage Conservation Act could be ordered only for objects already under state protection and did not cover impact assessment.

How the text changed during the proceedings

  • The latest text lists the environment committee (keskkonnakomisjon) as the leading committee; the documents show no content amendments.

Votes

No votes have been held yet.