Act amending the Water Act and other acts ↗
- Introduced:
- 16 November 2026
- Author:
- Government · coalition at introduction: Reform, Eesti 200
- Stage
- Taken into proceedings
The draft sets up the national framework for applying uniform EU hygiene, conformity assessment and labelling rules to products in contact with drinking water, and adjusts the Water Act (Veeseadus) following the European Commission's infringement-procedure remarks. It also restricts access to the location data of drinking water intakes and removes the Health Board's (Terviseamet) mandatory approval in the permit procedure for wells of public water supplies. According to the explanatory memorandum, the aim is to improve drinking water safety and reduce administrative burden.
Changes and additions
Requirements and conformity assessment for products in contact with drinking water
Products in contact with drinking water and the finished materials used in them must meet the EU acts adopted under Article 11 of Directive (EU) 2020/2184. A conformity assessment body assesses compliance, and the Product Conformity Act (toote nõuetele vastavuse seadus) applies with the Water Act's special rules.TTJA supervision of products in contact with drinking water
The Consumer Protection and Technical Regulatory Authority (Tarbijakaitse ja Tehnilise Järelevalve Amet, TTJA) carries out state market surveillance of hygiene compliance, conformity assessment, labelling and placing products on the market. Drinking water quality supervision stays with the Health Board (Terviseamet).Definition of priority consumption site
According to the memorandum, the European Commission noted that the current definition does not clearly enough cover large premises that are not open to the public.A priority consumption site may be a large premises, open to the public or not accessible to it, that is not a household and whose many users may be exposed to water-related risks. The Health Board determines them based on a risk analysis, publishes the list and notifies the owner.Risk-based approach and review of the monitoring plan
The current wording allows the risk-based approach to be left unapplied in certain cases, and the drinking water monitoring plan is updated every six years.The risk-based approach may only be adapted, not left unapplied. The drinking water monitoring plan is reviewed continuously and updated at least every six years.Access restriction on water intake location data
Geographic location data processed in the risk assessment of a water intake in the water health safety information system is treated as information for internal use if its disclosure would endanger water supply security or public health. The restriction lasts until the intake is no longer used.Removal of the Health Board's approval in the well permit procedure
The Health Board acts as an approving body in the use-permit procedure for a public water supply well, and lack of its approval may be a ground to refuse the water permit.The mandatory approval is dropped. The permitting authority may ask the Health Board for an opinion when needed, and the Health Board continues to approve monitoring plans and supervise water quality.Transition for existing buildings
In structures built before 31 December 2026, the new requirements apply from the moment a new product in contact with drinking water is taken into use. Existing products do not have to be replaced only because of the new rules.
Votes
No votes have been held yet.
Sources (Riigikogu documents) (7)
Official page of the bill on the Riigikogu website: proceedings and all documents.